Features · Production
My Tasks
Overview
Everything assigned to you, grouped by project: shot and asset tasks with their status, due date and newest daily, and previz work alongside them.
The list is searchable and sortable, the same way the Media tab is. Type a shot or asset name, a task, a project or a status to narrow it; order by shot/asset, task, status or due date, and turn any of those round with the arrow beside it — which says what it will do (“A → Z”, “Soonest first”). Statuses sort in the order the studio set them, not alphabetically.
It opens in name order, and remembers how you left it.
How to
- My Tasks in the top navigation.
- Type into the search box; ✕ clears it.
- Pick what to order by, and click the arrow to turn the order around.
- Upload daily on any row — the dialog names the shot and task before you pick a file.
Controls
| Control | Type | What it does |
|---|---|---|
| Search | Text | Shot or asset, task, project or status — code or name. Several words narrow it. |
| Order by | Select | Shot / asset, task, status or due date. |
| Direction | Toggle | Turns any order around; reads “A → Z”, “Soonest first” and so on. |
Known edges
Rows stay grouped by project and the order applies inside each group, so sorting by name does not shuffle two shows together. A project with nothing matching the search drops out of the way until the search is cleared. Omitted tasks never appear here.
